NYC’s Scary New Tourist Attraction: All-Glass Sky Lift

Subjecting yourself to a voluntary affair has never been easier.

Midtown Development One Vanderbilt will soon offer thrill-seekers a new way to scare New York: an all-glass enclosed lift outside the building. The See-through Human Dumbwater, called Ascent, will take riders 1,210 feet above the city, where they can gaze on Madison Avenue.

The journey, along with other interactive features in the crown of developer SL Green’s $ 3.3 billion, 77-story, 1.7 million-square-foot office tower, “redefined the way people will experience the intersection between nature and the built environment.” Will do ” Press release From Realty Corporation.

For those looking for a non-moving but still anti-gravity experience, the skyscraper – by far the tallest set in central Midtown – will offer levitation, featuring a “fully transparent glass sky box” Included are those who exit the building and give visitors an experience. Hanged 1,063 feet above Manhattan.

People who look more subdued can retire to the outdoor terrace bar, or “the world’s tallest urban outdoor alpine meadow.” All attractions have been opened to the public in late October.

One-Vanderbilt: There will be an all-glass elevator on the side of the tallest skyscraper in Central Midtown.
The tallest skyscraper in Central Midtown will feature an all-glass lift on its side.
SL Green

Summit One Vanderbilt (as development is referring to its rooftop attractions) will also have a vast art experience designed by Kenzo Digital and culinary offerings from Danny Meyers Union Square Events.

SuperChef will also open Le Pavillon, an 11,000-square-foot restaurant on the second floor of the Daniel Bauld building.

“We have created a destination that provides an interactive experience that will be remembered throughout life with the best, detailed views throughout New York City,” SL Green CEO Mark Holiday said in a statement. “This is a special, thrilling place that would make New Yorkers and travelers from the country and the world want to come back time and time again.”

One-Vanderbilt
Project cost developer SL Green $ 3.3 billion.
SL Green

Registration is now open for previews before the October 21 launch of Summit One Vanderbilt Summit OV.com. The new building was officially opened to tenants at the September ribbon cutting ceremony.

Be the first to comment

Leave a Reply

Your email address will not be published.


*